Work Cycle
Work Cycle
My work cycle varies. I work 12 hour shifts so on work days I do not do much more than Work, Sleep and do it again. This Week is a Long Week meaning that there are four days in the work cycle instead of 3. Though the way the Week is broken up I work from this Wednesday to next Sunday. Though Sunday is actually counted as one of the days on next weeks work cycle. So I work 5 consecutive days. Have 3 off, then work 2 days and have 4 off. That is what my work cycle breaks down to. During a Work cycle I do not have a lot of time to do much besides work and rest as already stated.
I will keep an eye on the server and make sure it stays up. I cannot do much more than that. Last night there was down time due to the MariaDB shutting down. This is likely yet more configuration Tuning.
If you setup up a LAMP or LEMP and install Friendica, turn on debugging the error logs go nuts. There are many known issues with the code base though 99.8% of them are non terminal. So they get worked around for now. I will eventually start refactoring code. Though in the mean time I have to keep the server up and running. My instance is Pristine that does not make it special it means that I have not modified any of the code base at all. I have only modified the settings. It is not actually a Vanilla installation as I do use Addons. So if Friendica works on other Instances then it will work here as well. Though it is my understanding that most Friendica Admins deal with the types of issues I am overcoming.
I will be around more after my work cycle. I hope everyone has a great week!
plan-A likes this.